September 2009
North side of the house
Exterior is nearly finished, siding, windows, roofing trim are all in place.  The siding and trim has been painted
South side
Gutters are in place, we are now working on a design for the posts and railings.  We are also designing the patio and gardens near the walkout.
Drywall is being loaded into the upstairs window, set in the loft and will be hung in the loft and great room
The stairs going to the loft.  Insulation has been installed, we used a foam skim coat and then filled the rest of the cavity with cellulose for a great fit. Electricity has been run and drywall will soon be hung.