| Framing is moving along, we hope to have the roof framed, covered and papered this week. Then the mechanicals will start. | ||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||
| Pictures were taken July 18th | ||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||
| Below is the view from the Great Room | ||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||
| July 30 The roof is decked and papered, the windows are being installed, trim is being hung and soon the siding will be installed |
||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||
| August 15th Siding has been installed and painting has begun. Plumbing has been set and the electrical outlets and can lights are being installed, the geothermal lines are in and the duct work will start this week! |
||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||